New business electricity supplies, 3-phase upgrades and load assessments for Midlands businesses, from our NICEIC-approved commercial electricians.
Nobody thinks about their power supply until it causes a problem. The main breaker trips every time the compressor kicks in. The new oven won’t connect. The EV chargers you promised your staff turn out to need more power than the building can give.
We hear versions of this every week. We’ve been sorting out commercial power supplies for over 40 years, for offices, shops, warehouses, factories and schools across the Midlands. We’re a family firm, so we look after your premises as if they were our own. The work is done properly, you keep trading, and we leave everything tidy, tested and certified.
Most people hear “power supply” and picture the cable from the street. In reality, it’s a whole chain. The incoming supply and meter feed the main switchgear, which feeds sub-mains running to different parts of the building, which feed the distribution boards for each circuit. If one link is weak, you’ll feel it everywhere else.
So we look at the full picture, not just the bit that’s playing up. We’ll ask what you’re running today and what you’re planning to add over the next few years, then suggest the most sensible way forward. Sometimes that’s a full upgrade. Sometimes it’s just a better layout of what you already have. Either way, everything meets BS 7671 and is fully tested and certified.
Moving into a new unit, building from scratch, or splitting a building into separate tenancies? You’ll need your Distribution Network Operator (DNO) involved, and the paperwork can be a slog.
We take that off your plate. We work out how much capacity you really need, put together the information the DNO asks for, chase them for you and install everything on your side of the meter. By the time the DNO has finished their part, you’re ready to switch on.
Plenty of businesses start out on single phase and simply grow past it. Add some heavy machinery, a commercial kitchen, air conditioning, a few fast EV chargers or a solar array, and you’ll soon hit the ceiling.
We fit new 3-phase supplies and convert existing single-phase ones. That includes the switchgear, cabling and distribution boards needed to share the load evenly across all three phases.
Good distribution decides whether a fault knocks out one corner of the building or the whole site. We run sub-mains out to outbuildings, mezzanines and new production lines, replace worn or overloaded distribution boards, and rearrange circuits so problems can be isolated quickly. It makes the next expansion a lot easier too.
A building site needs safe power from the first day. We set up temporary builders’ supplies and site distribution to the stricter rules that apply on construction sites. When the build wraps up, we either take it all down or fold it into the permanent installation.
Before you spend money on an upgrade, it helps to know where you stand. A load assessment shows how much of your supply you’re using and how much is left. Often a rebalance or a distribution upgrade does the job, which saves you the cost and the wait of a full supply increase.
A 3-phase supply delivers electricity through three live conductors instead of one. Each carries alternating current, but they’re timed a third of a cycle apart. As one phase dips, another is on its way up, so you get a steady flow of power instead of a series of pulses.
In the UK, single-phase is 230 volts, while 3-phase gives you 400 volts between phases. That extra capacity is why it’s used for big motors, compressors, lifts and industrial equipment. It’s also more efficient, since the same load can run on smaller cables.
If you run a small office or shop with lighting, computers and a kettle, single-phase is usually plenty. 3-phase starts to make sense once you have heavy or constant loads, such as:
Not sure where you fall? Tell us what you run and what you’re planning, and we’ll give you a straight answer. If you don’t need to upgrade, we’ll say so.
There’s no single price, because every site is different. The main things that affect the cost are:
The best way to get a real figure is a site visit and a load assessment. From there you’ll get a clear, itemised quote with no surprises and no obligation.
An undersized supply rarely gives up all at once. It tends to give you warnings first:
If any of that sounds familiar, get it looked at sooner rather than later. A commercial EICR is often the best place to start, as it shows us the condition of what you’ve got before we plan anything new.
You get the care of a family business and the know-how of a contractor with over 40 years behind it.
Need a new connection, a 3-phase upgrade, or just an honest opinion on how much capacity your building has left? Get in touch with our commercial electricians. We’ll talk through your plans, visit your site and send over a clear quote with no obligation.